Aug 11, 2025 | NEWS
Balfour Beatty Vinci engineers are gearing up for a nine-night lift and slide operation to place a 112m-long HS2 bridge deck over Lawley Middleway on Birmingham’s Curzon Street approaches. The 1,631-tonne giant steel span forms part of a one-mile stretch of five...
Aug 11, 2025 | NEWS
Hull based Kingston Modular Systems has filed a notice of intention to appoint an administrator. The modular building specialist has been in business since 2015 and latest accounts for the year to May 31 2024 show a turnover of £12.6m generating a pre-tax loss of...
Aug 11, 2025 | NEWS
O’Halloran & O’Brien has secured the contract to carry out a major package of enabling works at Medway Council’s flagship £150m Strood Civic riverside regeneration. The 32-month programme, running from September 2025 to April 2028, covers phases 1B to 5 of the...
Aug 11, 2025 | NEWS
Buro Happold reckons that its new facade design tool could cut residential build costs by £10,000 per unit.Read Full Article: The Construction Index from All Construction News | Construction Index https://ift.tt/Hr4n0wf
Aug 11, 2025 | NEWS
A steelwork bridge structure the length of a football pitch is set to be jacked into place this week.Read Full Article: The Construction Index from All Construction News | Construction Index https://ift.tt/5Osb1Y9