0845 250 4390 enquiries@cita.co.uk

The cost of repairing substandard local authority bridges in Great Britain has risen by 34% in the past year alone to £6.7bn.

The cost of repairing substandard local authority bridges in Great Britain has risen by 34% in the past year alone to £6.7bn.

Read Full Article: The Construction Index

from All Construction News | The Construction Index http://bit.ly/2SDqgQJ