The former Washwood Heath Railway Works in Birmingham has been pulled down to make way for High Speed Two (HS2) Limited to build an all-new train maintenance depot.
The former Washwood Heath Railway Works in Birmingham has been pulled down to make way for High Speed Two (HS2) Limited to build an all-new train maintenance depot.
Read Full Article: The Construction Index
from All Construction News | The Construction Index https://ift.tt/2NhH7Xq