{"id":1149,"date":"2018-12-05T09:26:17","date_gmt":"2018-12-05T09:26:17","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1149"},"modified":"2018-12-05T09:26:17","modified_gmt":"2018-12-05T09:26:17","slug":"hunt-for-smart-motorway-trio-to-deliver-7bn-plan","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/hunt-for-smart-motorway-trio-to-deliver-7bn-plan\/","title":{"rendered":"Hunt for smart motorway trio to deliver \u00a37bn plan"},"content":{"rendered":"<p>Highways England is advancing plans to deliver all the smart motorway programme through a single alliance arrangement.<\/p>\n<p>Radical plans to adopt a full alliance model for all smart motorway work are now underway with bids being invited to find three tier one contractors, two designers and a new production manager specialist to create a production hub.<\/p>\n<p>This promises a major shake-up in the motorway industry where around eight contractors are presently engaged.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"209475\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.faset.org.uk%2Fguidance-2%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE_FASET-MPU_JULY18.gif\"\/><\/a><\/div>\n<\/div>\n<p>The entire 10-year spend is expected to be around \u00a37bn with the new &#8216;on-site assembly partners&#8217; sharing out \u00a35.95bn across three new operating regions in the north,\u00a0midlands and south.<\/p>\n<p>The arrangement will also include two design partners allocated to the north or south and a single production management partner, accountable for the programme-wide management activities within the production hub.<\/p>\n<p>Shaun Pidcock, Smart motorways programme director, told the Enquirer: &#8220;We want a production line approach, using a planned programme with a level spending profile for greater continuity of work that gets the best from the supply chain and can drive greater standardisation of design and use of offsite construction. &#8221;<\/p>\n<p>&#8220;We aim to optimise learning and get everybody focused on delivering the best solutions on site,&#8221; he added.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"170875\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=++https%3A%2F%2Fwww.mrcropper.co.uk%2F%3Futm_source%3DCE%2520MPU%2520Banner%2520Advert%26utm_medium%3DWeb%2520advert%26utm_campaign%3DCE%2520MPU%2520Banner%2520Advert%26utm_term%3DCE%2520MPU%2520Banner%2520Advert%26utm_content%3DConstruction%2520Enquirer%2520Advert%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/37642-Mr Cropper 300x250px CE Ad.gif\"\/><\/a><\/div>\n<\/div>\n<p>He said that the alliance would work on an open platform, sharing resources when needed and engaging with strategic tier 2 supply teams early to book factory space for key supplies like gantries.<\/p>\n<p>The production hub will operate under an alliance board made up of Highways England and its design and tier one stakeholders.<\/p>\n<p>Highways England expects to make big savings, drive down man hours on site, drive innovation and make greater use of standardised design using the new alliance approach.<\/p>\n<p>Further documents can be found on the <a href=\"https:\/\/highways.bravosolution.co.uk\/web\/login.shtml\">website<\/a>, with submissions due back on 18 January.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"134243\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=++https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fshoring-equipment%2F%3Futm_source%3DGFS%2520CE%2520MPU%2520Advert%26utm_medium%3DWebsite%26utm_campaign%3DGFS%2520CE%2520MPU%2520Advert%26utm_term%3DGFS%2520CE%2520MPU%2520Advert%26utm_content%3DShoring%2520Equipment%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/grounforce37640-GF Shorco 300x250px CE Ad B.gif\"\/><\/a><\/div>\n<\/div>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"99972\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.peri.ltd.uk%2Fprojects%2Fcivil-engineering.html%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/35_PERI_AD_MPU_CE_Infrastructure_300x250px_JULY-18_AW2.gif\"\/><\/a><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>from Construction Enquirer https:\/\/ift.tt\/2zHVleV<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highways England is advancing plans to deliver all the smart motorway programme through a single alliance arrangement. Radical plans to adopt a full alliance model for all smart motorway work are now underway with bids being invited to find three tier one contractors, two designers and a new production manager specialist to create a production [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-1149","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1149","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1149"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1149\/revisions"}],"predecessor-version":[{"id":1150,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1149\/revisions\/1150"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/148"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}