{"id":1235,"date":"2018-12-07T09:58:10","date_gmt":"2018-12-07T09:58:10","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1235"},"modified":"2018-12-07T09:58:10","modified_gmt":"2018-12-07T09:58:10","slug":"plans-in-for-112m-upstream-leeds-flood-defences","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/plans-in-for-112m-upstream-leeds-flood-defences\/","title":{"rendered":"Plans in for \u00a3112m upstream Leeds flood defences"},"content":{"rendered":"<p>Plans for the next phase of the Leeds flood alleviation scheme to reduce flood risk along the River Aire have been submitted.<\/p>\n<p>Plans for the next phase of the Leeds flood alleviation scheme to reduce flood risk along the River Aire have been submitted.<\/p>\n<p>Read Full Article: <a href=\"https:\/\/www.theconstructionindex.co.uk\/news\/view\/plans-in-for-112m-leeds-flood-defences\">The Construction Index<\/a><\/p>\n<p><meta property=\"og:image\" content=\"https:\/\/www.theconstructionindex.co.uk\/assets\/news_articles\/2018\/12\/1544172132_lookingupstreamtorailwayviaduct.jpg\"><\/p>\n<p>from All Construction News | The Construction Index https:\/\/ift.tt\/2QhomYZ<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plans for the next phase of the Leeds flood alleviation scheme to reduce flood risk along the River Aire have been submitted. Plans for the next phase of the Leeds flood alleviation scheme to reduce flood risk along the River Aire have been submitted. Read Full Article: The Construction Index from All Construction News | [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":154,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[4],"class_list":["post-1235","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-all-construction-news-the-construction-index"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1235"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1235\/revisions"}],"predecessor-version":[{"id":1236,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1235\/revisions\/1236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/156"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1235"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1235"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}