{"id":1451,"date":"2018-12-14T09:36:19","date_gmt":"2018-12-14T09:36:19","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1451"},"modified":"2018-12-14T09:36:19","modified_gmt":"2018-12-14T09:36:19","slug":"plantworx-on-track-for-a-show-sell-out","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/plantworx-on-track-for-a-show-sell-out\/","title":{"rendered":"Plantworx on track for a show sell-out"},"content":{"rendered":"<p>The Plantworx team has revealed that the 2019 event is over 75% sold out overall &#8211; even though its new East of England Arena home in Peterborough has 20% more exhibition space than the 2017 event.<\/p>\n<p>The digging demonstration areas are 97% sold out \u2013 with only two stands remaining.<\/p>\n<p>Angela Spink, Plantworx Sales Manager said, \u201cWe are delighted with the response we have had from companies wanting to book their stand space at the show.<\/p>\n<p>The uncertainty of Brexit has not been a deterrent for our exhibitors and it appears to be \u2018business usual.<\/p>\n<p>\u201cWe are particularly pleased to announce that 22% of the exhibitors (67) are brand new to the event and will be making their show debut in June next year.\u00a0 A sure sign confidence is high in our sector.\u201d<\/p>\n<p>The 2019 event (11 \u2013 13 June East of England Arena, Peterborough) has the benefit of an Indoor purpose-built Arena which is now filling up and is 65% sold out.<\/p>\n<p>from Construction Enquirer https:\/\/ift.tt\/2ULJvJk<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Plantworx team has revealed that the 2019 event is over 75% sold out overall &#8211; even though its new East of England Arena home in Peterborough has 20% more exhibition space than the 2017 event. The digging demonstration areas are 97% sold out \u2013 with only two stands remaining. Angela Spink, Plantworx Sales Manager [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":149,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-1451","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1451"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1451\/revisions"}],"predecessor-version":[{"id":1452,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1451\/revisions\/1452"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/156"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}