{"id":1537,"date":"2018-12-18T13:23:21","date_gmt":"2018-12-18T13:23:21","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1537"},"modified":"2018-12-18T13:23:21","modified_gmt":"2018-12-18T13:23:21","slug":"rail-inspector-in-safety-blast-after-another-near-miss","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/rail-inspector-in-safety-blast-after-another-near-miss\/","title":{"rendered":"Rail inspector in safety blast after another near miss"},"content":{"rendered":"<p>The Chief Inspector of Rail Accidents has attacked industry safety standards after another near miss incident.<\/p>\n<p>Simon French hit out after a report was released into an incident in north London where a team of track workers narrowly avoided being hit by a passing train.<\/p>\n<p>The Rail Accident Investigation Branch report revealed the workers were placing a trolley on a line they mistakenly thought had been blocked.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"145848\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.rics.org%2Fuk%2Fproducts%2Fdata-products%2Fdemo%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Construction Enquirer MPU.jpg\"\/><\/a><\/div>\n<\/div>\n<p>The report found ineffective safety practices and no clear &#8216;Person in Charge\u2019<\/p>\n<p>French said: \u201cThe number and type of near misses in recent years is hugely disappointing given the efforts made to address track worker safety during that time.<\/p>\n<p>&#8220;Over the same period, Network Rail has introduced a number of changes to procedures, and several new initiatives, to try to reduce the risk. One of these re-introduced the concept that there should be a \u2018person in charge\u2019.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"247443\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ciobacademy.org%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Construction enquirer Academy MPU Final.gif\"\/><\/a><\/div>\n<\/div>\n<p>&#8220;This was intended to make an identifiable and capable person responsible for all aspects of the planning and delivery of safe work, for each job.<\/p>\n<p>&#8220;It is disappointing that our investigation found that the way in which this concept had been implemented lacked clarity, and the result of this was confusion on site.<\/p>\n<p>&#8220;As well as this organisational issue, we found that staff were disorientated, and did not know which line was which.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"261132\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.allplan.com%2Fuk_en%2F%3Futm_source%3DConstructionEnquirer%26utm_medium%3DWebBanner%26utm_campaign%3DConstructionGeneral%26utm_content%3DDec2018%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/all plan web-banner-MPU-CE-300px-250px.gif\"\/><\/a><\/div>\n<\/div>\n<p>&#8220;This could have been readily solved if they had had proper diagrams, and if clear signs had been provided at the point where they entered the railway.<\/p>\n<p>&#8220;RAIB has raised this issue before \u2013 it\u2019s time that the industry thought long and hard about the way it provides critical safety information to its staff and contractors.<\/p>\n<p>&#8220;I am concerned that, despite much effort and many initiatives, we are not seeing the hoped-for improvements in safety for track workers.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"170875\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=++https%3A%2F%2Fwww.mrcropper.co.uk%2F%3Futm_source%3DCE%2520MPU%2520Banner%2520Advert%26utm_medium%3DWeb%2520advert%26utm_campaign%3DCE%2520MPU%2520Banner%2520Advert%26utm_term%3DCE%2520MPU%2520Banner%2520Advert%26utm_content%3DConstruction%2520Enquirer%2520Advert%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/37642-Mr Cropper 300x250px CE Ad.gif\"\/><\/a><\/div>\n<\/div>\n<p>&#8220;Despite all the efforts that the industry has made, this kind of alarming incident is still happening.<\/p>\n<p>&#8220;There needs to be complete clarity about who is in charge, where the work is to take place, and which lines are open to traffic.<\/p>\n<p>&#8220;I hope that the railway industry will do what\u2019s necessary to ensure that track workers properly understand the track safety processes and the roles of everybody involved in their implementation.&#8221;<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"216019\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fnoticeboard-auth.conquest.ltd.uk%2Fhome%3Futm_campaign%3Dnotice_board%26utm_medium%3Dbanner%26utm_source%3Dconstruction_enquirer\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Noticeboard-Advert-Con Enq (1).gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94892\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fcisrs.org.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE_CISRS_CPD.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/2rGAuEh<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Chief Inspector of Rail Accidents has attacked industry safety standards after another near miss incident. Simon French hit out after a report was released into an incident in north London where a team of track workers narrowly avoided being hit by a passing train. The Rail Accident Investigation Branch report revealed the workers were [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":149,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-1537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1537"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1537\/revisions"}],"predecessor-version":[{"id":1538,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1537\/revisions\/1538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/145"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}