{"id":1627,"date":"2018-12-20T12:35:27","date_gmt":"2018-12-20T12:35:27","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1627"},"modified":"2018-12-20T12:35:27","modified_gmt":"2018-12-20T12:35:27","slug":"tender-date-for-a66-northern-trans-pennine-dualling","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/tender-date-for-a66-northern-trans-pennine-dualling\/","title":{"rendered":"Tender date for A66 northern trans-Pennine dualling"},"content":{"rendered":"<p>Highways England is aiming to invite tenders for the A66 northern trans-Pennine dualling in October 2019.<\/p>\n<p>The agency set out its provisional timetable as it invited contractors to take part in market testing for the 50-mile strategic transport corridor between the M6 and A1(M) motorways.<\/p>\n<p>Single carriageways sections total 21 miles with plans to also enhance capacity at the junctions at Scotch Corner on the A1 and M6 J40 at Penrith.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"165527\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.conquest.ltd.uk%2F%3Futm_source%3Dconstruction_enquirer%26utm_campaign%3Dconstruction_enquirer_ad+%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Conquest-Advert-White-Footer.gif\"\/><\/a><\/div>\n<\/div>\n<p>Consultant Arcadis is presently working up designs and economic and environmental assessments for the route.<\/p>\n<p>Costings have still not been finalised but the project is expected to come in at over \u00a3800m.<\/p>\n<p>The A66 is significantly under-utilised, with a poor safety record and only intermittent sections of dual carriageway adding to traffic volume and journey times.<\/p>\n<p>Highways England is now releasing a market engagement questionnaire and plans to hold a scheme launch event in February 2019.<\/p>\n<p>Interested contractors can email the NIP Market Engagement <a href=\"mailto:nipmarketengagement@highwaysengland.co.uk\">inbox <\/a>\u00a0for details about the engagement day and the questionnaire.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"165577\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.haki.com%2Fproduct%2Fhaki-stair-towers%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE_HAKI-MPU_SEPT18.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/2GxvVGE<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highways England is aiming to invite tenders for the A66 northern trans-Pennine dualling in October 2019. The agency set out its provisional timetable as it invited contractors to take part in market testing for the 50-mile strategic transport corridor between the M6 and A1(M) motorways. Single carriageways sections total 21 miles with plans to also [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":150,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-1627","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1627"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1627\/revisions"}],"predecessor-version":[{"id":1628,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1627\/revisions\/1628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/155"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}