{"id":1749,"date":"2019-01-03T13:14:39","date_gmt":"2019-01-03T13:14:39","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1749"},"modified":"2019-01-03T13:14:39","modified_gmt":"2019-01-03T13:14:39","slug":"construction-growth-slows-but-optimism-remains","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/construction-growth-slows-but-optimism-remains\/","title":{"rendered":"Construction growth slows but optimism remains"},"content":{"rendered":"<p>UK construction growth slowed down as 2018 came to an end but conversely there was an uplift in optimism.<\/p>\n<p>UK construction growth slowed down as 2018 came to an end but conversely there was an uplift in optimism.<\/p>\n<p>Read Full Article: <a href=\"https:\/\/www.theconstructionindex.co.uk\/news\/view\/construction-growth-slows-but-optimism-remains\">The Construction Index<\/a><\/p>\n<p><meta property=\"og:image\" content=\"https:\/\/www.theconstructionindex.co.uk\/assets\/news_articles\/2019\/01\/1546514650_civ-eng.jpg\"><\/p>\n<p>from All Construction News | The Construction Index http:\/\/bit.ly\/2AscOIm<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UK construction growth slowed down as 2018 came to an end but conversely there was an uplift in optimism. UK construction growth slowed down as 2018 came to an end but conversely there was an uplift in optimism. Read Full Article: The Construction Index from All Construction News | The Construction Index http:\/\/bit.ly\/2AscOIm<\/p>\n","protected":false},"author":1,"featured_media":156,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[4],"class_list":["post-1749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-all-construction-news-the-construction-index"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1749"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1749\/revisions"}],"predecessor-version":[{"id":1750,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1749\/revisions\/1750"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/146"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}