{"id":1975,"date":"2019-01-11T07:28:52","date_gmt":"2019-01-11T07:28:52","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=1975"},"modified":"2019-01-11T07:28:52","modified_gmt":"2019-01-11T07:28:52","slug":"costain-bags-bundled-a19-junction-upgrades-for-125m","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/costain-bags-bundled-a19-junction-upgrades-for-125m\/","title":{"rendered":"Costain bags bundled A19 junction upgrades for \u00a3125m"},"content":{"rendered":"<p>Highways England has signed a deal with Costain worth \u00a3125m to deliver two key junction upgrades on the A19 in south Tyneside.<\/p>\n<p>The A19 Testo junction upgrade and Downhill Lane junction upgrades have been bundled together as a single contract as part of plans to support local plans for an International Advanced Manufacturing Park\u00a0 to the north of the existing Nissan Motor factory.<\/p>\n<p>The project aims to ease congestion with new bridges and flyovers.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"216019\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fnoticeboard-auth.conquest.ltd.uk%2Fhome%3Futm_campaign%3Dnotice_board%26utm_medium%3Dbanner%26utm_source%3Dconstruction_enquirer\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Noticeboard-Advert-Con Enq (1).gif\"\/><\/a><\/div>\n<\/div>\n<p>Work is now expected to start next year on the long-awaited junction work.<\/p>\n<p>The project aims to ease congestion with new bridges and flyovers on the A19.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"99972\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.peri.ltd.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/52_PERI_AD_MPU_CE_300x250px_DEC-18_AW.gif\"\/><\/a><\/div>\n<\/div>\n<p>Proposals for the Testo\u2019s junction<em> (below)<\/em>\u00a0 with the A184 would see a flyover built to bypass the roundabout in a bid to keep traffic flowing to and from the Tyne Tunnel.<\/p>\n<p><a href=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2019-01-10-at-12.08.33.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-276696\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2019-01-10-at-12.08.33.png\" alt=\"\" width=\"1472\" height=\"1092\" \/><\/a><\/p>\n<p>Just to the south of this, the Downhill Lane junction improvement <em>(below)<\/em> would see a second bridge added south of the current junction -presently a busy single bridge \u2013 creating a more traditional elevated roundabout layout.<\/p>\n<p><a href=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2019-01-10-at-12.07.04.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-276697\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2019-01-10-at-12.07.04.png\" alt=\"\" width=\"1454\" height=\"954\" \/><\/a><\/p>\n<p>Costain has endured a long wait for the project. The contractor was originally\u00a0appointed to deliver the Testo junction improvement back in 2006\u00a0under an early contractor involvement deal.<\/p>\n<p>But funding was withdrawn\u00a0in the Government\u2019s 2010 Spending Review forcing the junction upgrade to be placed on hold.<\/p>\n<p>The project was resurrected in the 2015-2020 Road Investment Strategy and bundled together with the Downhill Lane scheme in a bid to cut costs. The move effectively doubled the value of Costain&#8217;s order.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94603\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fen-gb.viewpoint.com%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Viewpoint-Ban-300x250.gif\"\/><\/a><\/div>\n<\/div>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"134243\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=++https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fshoring-equipment%2F%3Futm_source%3DGFS%2520CE%2520MPU%2520Advert%26utm_medium%3DWebsite%26utm_campaign%3DGFS%2520CE%2520MPU%2520Advert%26utm_term%3DGFS%2520CE%2520MPU%2520Advert%26utm_content%3DShoring%2520Equipment%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/grounforce37640-GF Shorco 300x250px CE Ad B.gif\"\/><\/a><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<div class=\"txtmark\"><\/div>\n<p>from Construction Enquirer http:\/\/bit.ly\/2H4lFFV<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highways England has signed a deal with Costain worth \u00a3125m to deliver two key junction upgrades on the A19 in south Tyneside. The A19 Testo junction upgrade and Downhill Lane junction upgrades have been bundled together as a single contract as part of plans to support local plans for an International Advanced Manufacturing Park\u00a0 to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":153,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-1975","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1975","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=1975"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1975\/revisions"}],"predecessor-version":[{"id":1976,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/1975\/revisions\/1976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/148"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=1975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=1975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=1975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}