{"id":2019,"date":"2019-01-14T09:41:20","date_gmt":"2019-01-14T09:41:20","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=2019"},"modified":"2019-01-14T09:41:20","modified_gmt":"2019-01-14T09:41:20","slug":"video-bridge-and-lock-gates-installed-in-dover-docks","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/video-bridge-and-lock-gates-installed-in-dover-docks\/","title":{"rendered":"Video: Bridge and lock gates installed in Dover docks"},"content":{"rendered":"<p>A single leaf bascule bridge and marina lock gates have been installed at the Dover Western Docks Revival (DWDR) development.<\/p>\n<p>A single leaf bascule bridge and marina lock gates have been installed at the Dover Western Docks Revival (DWDR) development.<\/p>\n<p>Read Full Article: <a href=\"https:\/\/www.theconstructionindex.co.uk\/news\/view\/video-bridge-and-lock-gates-installed-in-dover-docks\">The Construction Index<\/a><\/p>\n<p><meta property=\"og:image\" content=\"https:\/\/www.theconstructionindex.co.uk\/assets\/news_articles\/2019\/01\/1547452451_dover.jpg\"><\/p>\n<p>from All Construction News | The Construction Index http:\/\/bit.ly\/2SSHlqd<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A single leaf bascule bridge and marina lock gates have been installed at the Dover Western Docks Revival (DWDR) development. A single leaf bascule bridge and marina lock gates have been installed at the Dover Western Docks Revival (DWDR) development. Read Full Article: The Construction Index from All Construction News | The Construction Index http:\/\/bit.ly\/2SSHlqd<\/p>\n","protected":false},"author":1,"featured_media":151,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[4],"class_list":["post-2019","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-all-construction-news-the-construction-index"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=2019"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2019\/revisions"}],"predecessor-version":[{"id":2020,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2019\/revisions\/2020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/150"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=2019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=2019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=2019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}