{"id":2051,"date":"2019-01-15T08:02:18","date_gmt":"2019-01-15T08:02:18","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=2051"},"modified":"2019-01-15T08:02:18","modified_gmt":"2019-01-15T08:02:18","slug":"carey-wins-16m-stratford-waterfront-civils-package","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/carey-wins-16m-stratford-waterfront-civils-package\/","title":{"rendered":"Carey wins \u00a316m Stratford Waterfront civils package"},"content":{"rendered":"<p>The London Legacy Development Corporation has picked P J Carey to deliver the main substructure works for the Stratford Waterfront development at Queen Elizabeth Olympic Park in London.<\/p>\n<p>The 4.25 hectare site will see buildings for a new Sadler\u2019s Wells dance venue, the BBC concert Studios, London College of Fashion and the Victoria and Albert Museum.<\/p>\n<p>The site will also house 600 new homes.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"145884\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fndtg.training%2Fccdo-card%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CCDO-Banner-Loop.gif\"\/><\/a><\/div>\n<\/div>\n<p>Mace is leading the project and construction management on the \u00a31.1bn scheme.<\/p>\n<p>Carey&#8217;s appointment follows an award to infrastructure specialist Blu-3, which has secured the first \u00a35m enabling works package to install utilities and prepare the Stratford Waterfront for the main works due to start in summer 2019.<\/p>\n<p>Selection questionnaires are due out for the cladding and roofing packages on the individual buildings over the next two months.<\/p>\n<p>An industry day for mechanical, electrical and public health works is to be held on 6 February. Further details are available by emailing <a href=\"mailto:procurement@londonlegacy.co.uk\">LLDC<\/a>.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"128602\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Felfinkitchens.co.uk%2F%3Futm_source%3DConstruction%2520Enquirer%26utm_medium%3DMPU%26utm_campaign%3D100718%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Elfin_Construction-Enquirer-mpu_cyan-300x250-5.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"170875\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=++https%3A%2F%2Fwww.mrcropper.co.uk%2F%3Futm_source%3DCE%2520MPU%2520Banner%2520Advert%26utm_medium%3DWeb%2520advert%26utm_campaign%3DCE%2520MPU%2520Banner%2520Advert%26utm_term%3DCE%2520MPU%2520Banner%2520Advert%26utm_content%3DConstruction%2520Enquirer%2520Advert%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/37642-Mr Cropper 300x250px CE Ad.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer http:\/\/bit.ly\/2M8DD9p<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The London Legacy Development Corporation has picked P J Carey to deliver the main substructure works for the Stratford Waterfront development at Queen Elizabeth Olympic Park in London. The 4.25 hectare site will see buildings for a new Sadler\u2019s Wells dance venue, the BBC concert Studios, London College of Fashion and the Victoria and Albert [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":150,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-2051","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=2051"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2051\/revisions"}],"predecessor-version":[{"id":2052,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2051\/revisions\/2052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/155"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=2051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=2051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=2051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}