{"id":2089,"date":"2019-01-16T08:38:35","date_gmt":"2019-01-16T08:38:35","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=2089"},"modified":"2019-01-16T08:38:35","modified_gmt":"2019-01-16T08:38:35","slug":"plan-for-300m-lincolnshire-power-station","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/plan-for-300m-lincolnshire-power-station\/","title":{"rendered":"Plan for \u00a3300m Lincolnshire power station"},"content":{"rendered":"<p class=\"story-body__introduction\">Plans have been submitted to build a \u00a3300m energy from waste power station in North East Lincolnshire.<\/p>\n<p>The proposed plant would be located next to the existing South Humber Bank power station near Stallingborough and produce electricity for around 500,000 homes.<\/p>\n<p>Developer EP UK Investments hopes to receive a planning decision by the end of March from North East Lincolnshire Council.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"134243\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=++https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fshoring-equipment%2F%3Futm_source%3DGFS%2520CE%2520MPU%2520Advert%26utm_medium%3DWebsite%26utm_campaign%3DGFS%2520CE%2520MPU%2520Advert%26utm_term%3DGFS%2520CE%2520MPU%2520Advert%26utm_content%3DShoring%2520Equipment%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/grounforce37640-GF Shorco 300x250px CE Ad B.gif\"\/><\/a><\/div>\n<\/div>\n<p>The firm is a subsidiary of Europe\u2019s seventh largest power generator EPH. The Czech company acquired 2.2GW gas-fired power stations from Centrica in 2017 and commissioned a 420MW biomass power station at Lynemouth last year.<\/p>\n<p>James Crankshaw, head of engineering for EPUKI, said: \u201cWe are very pleased to announce the proposed development of an Energy Centre at the South Humber Bank Power Station and it follows the completion of our recent \u00a353m investment in the existing site.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94467\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.sapabuildingsystem.com%2Fen%2Fuk%2F%3Futm_source%3DCE%26utm_medium%3DBanner%26utm_campaign%3DBrand_Awareness%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE-Sapa-v1-1017.gif\"\/><\/a><\/div>\n<\/div>\n<p>\u201cThe project is not dependent on securing a power purchase agreement or other form of secured income such as a contract for difference\u00a0as other EFW projects have required and, as such, EPUKI expects to progress to the construction phase soon after planning is approved.<\/p>\n<p>\u201cThe Energy Centre will provide much needed new power generation and energy recovery facilities as well as creating permanent local jobs.\u201d<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94603\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=+https%3A%2F%2Fviewpoint.com%2Fen-gb%2Fproducts%2Fviewpoint-for-projects%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Strife-Twitter-Bans-300x250.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer http:\/\/bit.ly\/2HoONb4<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plans have been submitted to build a \u00a3300m energy from waste power station in North East Lincolnshire. The proposed plant would be located next to the existing South Humber Bank power station near Stallingborough and produce electricity for around 500,000 homes. Developer EP UK Investments hopes to receive a planning decision by the end of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-2089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=2089"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2089\/revisions"}],"predecessor-version":[{"id":2090,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/2089\/revisions\/2090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/154"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=2089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=2089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=2089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}