{"id":3246,"date":"2019-02-21T07:36:20","date_gmt":"2019-02-21T07:36:20","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=3246"},"modified":"2019-02-21T07:36:20","modified_gmt":"2019-02-21T07:36:20","slug":"200m-port-of-tilbury-expansion-plan-approved","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/200m-port-of-tilbury-expansion-plan-approved\/","title":{"rendered":"\u00a3200m Port of Tilbury expansion plan approved"},"content":{"rendered":"<p>The Government has given the green light for the \u00a3200m expansion of the Port of Tilbury in Essex.<\/p>\n<p>Construction of Tilbury 2 is scheduled to start next month with the intention to be operational by Spring 2020<\/p>\n<p>The proposed Tilbury 2 port will be constructed on land that formed the western part of the old Tilbury Power Station and is expected to create over 200 construction jobs.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"165527\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.conquest.ltd.uk%2F%3Futm_source%3Dconstruction_enquirer%26utm_campaign%3Dconstruction_enquirer_ad+%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Conquest-Advert-White-Footer.gif\"\/><\/a><\/div>\n<\/div>\n<p>Graham Construction is understood to be in line for the \u00a365m landside works, although the award of the contract has not been officially confirmed.<\/p>\n<p>The site will be developed with a RoRo terminal and specialist construction materials and aggregates terminal, which will also have facilities to\u00a0produce asphalt and concrete products.<\/p>\n<p>Designed by the Peterborough office of consultant Atkins, it will require an infrastructure corridor to accommodate road and two rail links to the existing rail and road network.<\/p>\n<p class=\"p1\"><span class=\"s1\"><\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"95499\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fcisrs.org.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CISRS Scrolling Ads for Construction Enquirer.gif\"\/><\/a><\/div>\n<\/div>\n<p><\/span><\/p>\n<p>On the marine side, an existing jetty on the river will be lengthened to accommodate three vessels at any one time and the onward transportation of goods by barge to London.<\/p>\n<div class=\"break-out-box\">\n<h3>Tilbury 2 works<\/h3>\n<div id=\"attachment_162695\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Tilbury2-port.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-162695 size-full\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Tilbury2-port.jpg\" alt=\"\" width=\"1174\" height=\"740\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">Existing power station site (above) and proposed redevelopment (below)<\/p>\n<\/div>\n<ul>\n<li>Constructiion of a single 1.1m sq ft mega shed and several storage and production structures associated with the construction materials and aggregates terminal.<\/li>\n<li>Creation of hard surfaced pavements<\/li>\n<li>New and improved conveyors<\/li>\n<li>Erection of welfare buildings<\/li>\n<li>Construction of a new link road from Ferry Road to Fort Road<\/li>\n<li>Formation of a rail spur and sidings.<\/li>\n<li>Marine works involve improvement of and extensions to the existing river jetty including creation of a new RoRo berth<\/li>\n<li>Associated dredging of berth pockets around the proposed and extended jetty<\/li>\n<\/ul>\n<\/div>\n<p>Charles Hammond, chief executive of owner Forth Ports Group, said:\u00a0\u201cThis is great news for the UK at a time when the country needs its ports more than ever before.<\/p>\n<p>&#8220;Tilbury2 will deliver much needed port capacity to support businesses importing and exporting to and from Europe and the rest of the world. The terminal will be fit-for-purpose for the UK\u2019s departure from the European Union, utilising the latest technology and streamlined border processes, in support of continued market demand created by business growth.\u201d<\/p>\n<p>\u201cBy 2020, \u00a31bn will have been invested in Tilbury\u2019s expansion plans, including Tilbury2 and the 55-acre London Development Park, with the full backing of our shareholders.\u201d<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"124439\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=+http%3A%2F%2Fwww.hudsoncontract.co.uk%2Fliability%3Futm_source%3DConEnq%26utm_medium%3DBanner%26utm_campaign%3DFeb19%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/HC-Feb19-ConEnq-Ad.gif\"\/><\/a><\/div>\n<\/div>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"142065\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=+http%3A%2F%2Fwww.plantworx.co.uk%2Fevent%2F2019%2Fexhibit%3F_toolbar%3Dexhibit%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/PWx2019-Button-Ad-300x250.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/2XdxyNQ<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Government has given the green light for the \u00a3200m expansion of the Port of Tilbury in Essex. Construction of Tilbury 2 is scheduled to start next month with the intention to be operational by Spring 2020 The proposed Tilbury 2 port will be constructed on land that formed the western part of the old [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-3246","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/3246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=3246"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/3246\/revisions"}],"predecessor-version":[{"id":3247,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/3246\/revisions\/3247"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/151"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=3246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=3246"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=3246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}