{"id":3584,"date":"2019-03-01T10:42:42","date_gmt":"2019-03-01T10:42:42","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=3584"},"modified":"2019-03-01T10:42:42","modified_gmt":"2019-03-01T10:42:42","slug":"orourke-seals-70m-oxford-uni-biochem-project","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/orourke-seals-70m-oxford-uni-biochem-project\/","title":{"rendered":"O\u2019Rourke seals \u00a370m Oxford Uni biochem project"},"content":{"rendered":"<p>Laing O&#8217;Rourke has finally signed a contract with the University of Oxford for phase two expansion of its acclaimed biochemistry building.<\/p>\n<p>The first phase was successfully delivered by Laing O\u2019Rourke in 2008 and this phase will be the latest project in what will be a near 20-year continuous collaboration with the University of\u00a0Oxford.<\/p>\n<p>A key success factor in delivering the project will be to significantly de-risk the construction process within a live and very busy science, teaching and research site.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"128602\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Felfinkitchens.co.uk%2F%3Futm_source%3DConstruction%2520Enquirer%26utm_medium%3DMPU%26utm_campaign%3D100718%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Elfin_Construction-Enquirer-mpu_cyan-300x250-5.gif\"\/><\/a><\/div>\n<\/div>\n<p>This will be achieved by using Design for Manufacture and Assembly for the concrete structures, alongside the extensive use of MEP vertical risers and horizontal distribution service modules and plant rooms.<\/p>\n<p>The university has stuck with Hawkins Brown as architect but switched M&amp;E design to Hoare Lea and structures design to Pell Frischmann this time.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94469\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.technal.co.uk%2Fen%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/T_CE_070814.gif\"\/><\/a><\/div>\n<\/div>\n<p>Laing O\u2019Rourke will deliver the same envelope design as phase one with the challenge of matching existing finishes.<\/p>\n<div id=\"attachment_163408\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screen-Shot-2018-03-08-at-23.33.28.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-163408 size-full\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screen-Shot-2018-03-08-at-23.33.28.png\" alt=\"\" width=\"1204\" height=\"776\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">The internal plan layout of phase 2 has changed substantially from phase 1 with wet labs now located in the core of the building and write-up and teaching rooms now located around the perimeter.<\/p>\n<\/div>\n<p>Liam Cummins, head of UK Building, said: \u201cThe project is in total alignment with our 2025 mission to be the recognised leader of innovation and excellence in the construction industry and we look forward to bringing our sector expertise to work once again with The University of Oxford.\u201d<\/p>\n<p>The project is due to be completed by December 2020.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"145884\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fndtg.training%2Fccdo-card%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CCDO-Banner-Loop.gif\"\/><\/a><\/div>\n<\/div>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94469\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.technal.co.uk%2Fen%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/T_CE_070814.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/2IFvBqi<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Laing O&#8217;Rourke has finally signed a contract with the University of Oxford for phase two expansion of its acclaimed biochemistry building. The first phase was successfully delivered by Laing O\u2019Rourke in 2008 and this phase will be the latest project in what will be a near 20-year continuous collaboration with the University of\u00a0Oxford. A key [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":145,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-3584","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/3584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=3584"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/3584\/revisions"}],"predecessor-version":[{"id":3585,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/3584\/revisions\/3585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/152"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=3584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=3584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=3584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}