{"id":5472,"date":"2025-05-19T09:46:50","date_gmt":"2025-05-19T09:46:50","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=5472"},"modified":"2025-05-19T09:46:50","modified_gmt":"2025-05-19T09:46:50","slug":"mclaren-to-build-2400-bed-worker-campus-at-sizewell-c","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/mclaren-to-build-2400-bed-worker-campus-at-sizewell-c\/","title":{"rendered":"McLaren to build 2,400-bed worker campus at Sizewell C"},"content":{"rendered":"<p>McLaren Construction will deliver the huge accommodation campus for workers building the Sizewell C nuclear power station.<\/p>\n<p>Under a construction management agreement, McLaren will deliver the 2,400-bed campus for site workers, hailed as setting new standards in site accommodation.<\/p>\n<p>The scheme will see 16 residential blocks of three and four storeys built to house the incoming workforce.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"128950\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.jctltd.co.uk%2Fjct-construct%2Fdigital-subscriptions\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/JCT-Construct_ConstEnq_MPU_300x250px-2025.gif\"\/><\/a><\/div>\n<\/div>\n<p>Each building will be laid out in an east-west orientation and contain single-occupancy living units, each with its own ensuite, kitchenette, wardrobe, desk and TV.<\/p>\n<p>Every floor will house around 40 rooms accessed via a central corridor, with shared services cupboards providing hot water, power and waste distribution. Eight accessible rooms will be included in each three-storey block.<\/p>\n<p>Key packages for the building job are coming out to tender with foundations work slated to start in the Autumn.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; font-family: Arial, sans-serif; font-size: 15px;\">\n<thead>\n<tr>\n<th style=\"background-color: #ff511c; color: white; font-size: 20pt; font-weight: bold; padding: 12px; text-align: left;\" colspan=\"3\">Package Breakdown<\/th>\n<\/tr>\n<tr style=\"background-color: #ff511c; color: white; text-align: left;\">\n<th style=\"padding: 10px; border: 1px solid #ddd;\">Package<\/th>\n<th style=\"padding: 10px; border: 1px solid #ddd;\">Value (ex VAT)<\/th>\n<th style=\"padding: 10px; border: 1px solid #ddd;\">Contract Start<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">Foundations<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">\u00a35m\u2013\u00a310m<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">September 2025<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 10px; border: 1px solid #ddd;\">Steel Frame<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">\u00a330m\u2013\u00a340m<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">December 2025<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">Facades<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">\u00a320m\u2013\u00a330m<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">February 2026<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 10px; border: 1px solid #ddd;\">Bathroom Pods<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">\u00a35m\u2013\u00a310m<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">January 2026<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">Roofing<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">\u00a310m\u2013\u00a320m<\/td>\n<td style=\"padding: 10px; border: 1px solid #ddd;\">February 2026<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The campus will rise on the western edge of the Temporary Construction Area, near Leiston, where advanced works and site preparation are already underway.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"478038\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.creaghconcrete.co.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE_Creagh.gif\"\/><\/a><\/div>\n<\/div>\n<p>Archaeology, ecology and earthworks are in progress ahead of full build-out.<\/p>\n<p>Damian Leydon, site delivery director at Sizewell C, said: \u201cIt\u2019s going to house about 2,400 workers \u2013 and it will be much more than just a place where the team sleep after work.<\/p>\n<p><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/www.eadt_.co_.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-497839\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/www.eadt_.co_.jpg\" alt=\"\" width=\"620\" height=\"348\" \/><\/a><\/p>\n<p>\u201cWe\u2019re building a home away from home, somewhere the team can rest, recharge and be part of a community. A variety of amenities including a well-equipped gym and sports facilities, on-site restaurant and outdoor gardens, as well as a campus shop.\u201d<\/p>\n<p>The project forms part of the main campus strategy for Sizewell C and aims to provide high-quality welfare facilities during the peak construction phase of the nuclear plant.<\/p>\n<p>For further subcontract package information <a href=\"mailto:hannah.wilson@sizewellc.com\" target=\"_blank\" rel=\"noopener\">email Sizewell C team<\/a>.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"474739\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbrilliantideasltd.co.uk%2Falimats%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/6507-BI---Alimats-MPU---Constuction-Enquirer_01_s2.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"477525\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.beresfordsflooring.co.uk%2Fservices%2Fin-situ-concrete-works-packages%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/6769-BF---Beresfords-MPU---In-Situ-Concrete-Works-Packages_s4.gif\"\/><\/a><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>from Construction Enquirer https:\/\/ift.tt\/KXTJiFA<\/p>\n","protected":false},"excerpt":{"rendered":"<p>McLaren Construction will deliver the huge accommodation campus for workers building the Sizewell C nuclear power station. Under a construction management agreement, McLaren will deliver the 2,400-bed campus for site workers, hailed as setting new standards in site accommodation. The scheme will see 16 residential blocks of three and four storeys built to house the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":146,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-5472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/5472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=5472"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/5472\/revisions"}],"predecessor-version":[{"id":5473,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/5472\/revisions\/5473"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/148"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=5472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=5472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=5472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}