{"id":5758,"date":"2025-06-04T06:46:34","date_gmt":"2025-06-04T06:46:34","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=5758"},"modified":"2025-06-04T06:46:34","modified_gmt":"2025-06-04T06:46:34","slug":"wates-gets-start-date-for-victoria-tower-restoration","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/wates-gets-start-date-for-victoria-tower-restoration\/","title":{"rendered":"Wates gets start date for Victoria Tower restoration"},"content":{"rendered":"<p>Wates will start work this summer on the restoration of the Palace of Westminster\u2019s grade I listed Victoria Tower.<\/p>\n<p>Wates will repair the stonework on the exterior of the Tower to minimise the risk of stone fall. It will also encompass other elements such as conservation works to the window glazing, roof and flagpole. The last significant works on Victoria Tower were completed in the early 1990s.<\/p>\n<p>Since 2018 there have been multiple incidents of stone fall from the exterior of Victoria Tower.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"498294\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ursainside.co.uk%2Fcontact%2F%3Futm_source%3DCE%26utm_medium%3DMPU%26utm_campaign%3Dursainside%26utm_content%3Djune%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/50355 URSA CE Re-Skin MPU V2.gif\"\/><\/a><\/div>\n<\/div>\n<p>The work is currently scheduled to be completed around 2031 with a contract value of \u00a3132.7m, including VAT.<\/p>\n<p>Steve Holbrook, Managing Director at Wates, said: \u201cWates and Parliament share a commitment to preserving traditional building techniques while embracing innovative construction and logistic methodologies to protect and enhance this historic landmark.<\/p>\n<p>&#8220;The extensive repair and restoration work we will be carrying out on the Victoria Tower will ensure it can continue its important role on the parliamentary estate for decades to come.\u201d<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"478038\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.creaghconcrete.co.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE_Creagh.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"93789\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.constructionline.co.uk%2Finsights%2Fwhitepapers%2Fprocurement-act-guide%2F%3Futm_source%3Dpr%26utm_medium%3Dconstruction_enquirer%26utm_campaign%3Dprocurement_act%26utm_year%3D2025%26utm_content%3Dprocurement_act_guide\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/constructionline gifmaker_me.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/vsZq35T<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Wates will start work this summer on the restoration of the Palace of Westminster\u2019s grade I listed Victoria Tower. Wates will repair the stonework on the exterior of the Tower to minimise the risk of stone fall. It will also encompass other elements such as conservation works to the window glazing, roof and flagpole. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":146,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-5758","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/5758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=5758"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/5758\/revisions"}],"predecessor-version":[{"id":5759,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/5758\/revisions\/5759"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/153"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=5758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=5758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=5758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}