{"id":6318,"date":"2025-07-01T08:47:00","date_gmt":"2025-07-01T08:47:00","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=6318"},"modified":"2025-07-01T08:47:00","modified_gmt":"2025-07-01T08:47:00","slug":"80-energy-projects-unlocked-as-ofgem-backs-grid-expansion","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/80-energy-projects-unlocked-as-ofgem-backs-grid-expansion\/","title":{"rendered":"80 energy projects unlocked as Ofgem backs grid expansion"},"content":{"rendered":"<p>Ofgem has approved an initial \u00a324bn five-year funding package to keep the UK\u2019s gas infrastructure running safely and to begin a major upgrade of Britain\u2019s electricity supergrid.<\/p>\n<p>The decision kicks off the RIIO-3 price control period from 2026 to 2031 and includes funding for 80 electricity transmission projects aimed at connecting up to 126GW of clean energy capacity by 2030.<\/p>\n<p>More than \u00a315bn will go towards maintaining and operating the national gas grid and four regional distribution networks, while \u00a38.9bn is being committed upfront to the high-voltage electricity transmission system \u2013 with another \u00a31.3bn in reserve for ready-to-go projects.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"492636\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwinchmorebrickwork.co.uk%2Fabout-us%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/WINChMORE_JOBS_MPU.gif\"\/><\/a><\/div>\n<\/div>\n<p>The full grid investment programme is expected to top \u00a380bn by 2031 \u2013 the largest power network expansion since the 1960s. Upgrades will include 4400km of existing overhead lines and 3500km of new circuits, including offshore projects.<\/p>\n<table style=\"border-collapse: collapse; border-spacing: 0; font-family: Arial,sans-serif; font-size: 15px; width: 100%;\">\n<tbody>\n<tr style=\"background-color: #ff511c; color: white; font-size: 20px; font-weight: bold;\">\n<th style=\"padding: 10px; text-align: left;\" colspan=\"2\">Approved upfront \u00a324.2bn over the RIIO-3<\/th>\n<\/tr>\n<tr style=\"background-color: #ff511c; color: white; font-weight: bold;\">\n<th style=\"padding: 8px; border: 1px solid #ff511c; text-align: left;\">Investment Area<\/th>\n<th style=\"padding: 8px; border: 1px solid #ff511c; text-align: left;\">Funding Approved (ex VAT)<\/th>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">Electricity transmission upgrade (initial)<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a38.9bn<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u2018Use it or lose it\u2019 electricity investment<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a31.3bn<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">National Grid (NGET)<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a34.2bn<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">SSEN<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a33.1bn<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">Scottish Power (SPT)<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a31.6bn<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">Advanced Procurement Mechanism (APM)<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a34bn (accelerated access)<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">Gas transmission system maintenance<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a32.5bn<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">Gas distribution networks (regional)<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">\u00a312.8bn<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 8px; border: 1px solid #ff511c;\">Total approved baseline investment<\/td>\n<td style=\"padding: 8px; border: 1px solid #ff511c;\"><strong>\u00a324.2bn<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>The plan aims to shield households from future energy price spikes caused by global gas volatility, while cutting costs from wind farm constraint payments and improving grid resilience.<\/p>\n<p>The move follows months of cost scrutiny by the regulator, which slashed over \u00a38bn from company bids \u2013 around 26% \u2013 to keep spending efficient and protect consumers.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"124439\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.hudsoncontract.co.uk%2Fhudson-freelance%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/KCD043_MPU_Freelance_555x400px_Opt1_v1b.gif\"\/><\/a><\/div>\n<\/div>\n<p>A 6% equity return cap was also imposed on private investors.<\/p>\n<p>Network costs on household energy bills are expected to rise by \u00a3104 by 2031, but savings from grid efficiencies are projected to leave bills \u00a330 lower than they would have been without the investment.<\/p>\n<p>Ofgem boss Jonathan Brearley said: \u201cThis record investment will deliver a homegrown energy system that is better for Britain and better for customers. Doing nothing is not an option and will cost consumers more.\u201d<\/p>\n<p>The consultation on the draft determination runs until later this year, with final decisions due by end of 2025.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"491998\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fciob.me%2FCIOBvalue%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Value_MPU.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"163817\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.constructionenquirer.com%2Fdirectory%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/enquirer_directory_mpu.gif\"\/><\/a><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>from Construction Enquirer https:\/\/ift.tt\/IdeHZxg<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ofgem has approved an initial \u00a324bn five-year funding package to keep the UK\u2019s gas infrastructure running safely and to begin a major upgrade of Britain\u2019s electricity supergrid. The decision kicks off the RIIO-3 price control period from 2026 to 2031 and includes funding for 80 electricity transmission projects aimed at connecting up to 126GW of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":145,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-6318","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=6318"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6318\/revisions"}],"predecessor-version":[{"id":6319,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6318\/revisions\/6319"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/151"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=6318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=6318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=6318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}