{"id":6398,"date":"2025-07-04T11:47:00","date_gmt":"2025-07-04T11:47:00","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=6398"},"modified":"2025-07-04T11:47:00","modified_gmt":"2025-07-04T11:47:00","slug":"buyers-see-recovery-in-house-building-sector","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/buyers-see-recovery-in-house-building-sector\/","title":{"rendered":"Buyers see recovery in house building sector"},"content":{"rendered":"<p>Construction buyers have reported a return to growth in the house building sector for the first time since last September.<\/p>\n<p>But contraction in civil engineering and commercial work saw the bellwether S&amp;P Global UK Construction Purchasing Managers\u2019 Index drop below the standstill 50 mark again in June for the six month in a row.<\/p>\n<p>At 48.8 in June the index was up from 47.9 in May and signalled the slowest decline in construction output since the current period of contraction began in January.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"468489\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.flanneryplanthire.com%2Fplant-operator-training%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/flannery.gif\"\/><\/a><\/div>\n<\/div>\n<p>House building expanded with a score of 50.7 while civil engineering (44.2)\u00a0 was the weakest-performing area of construction activity as commercial work decreased at the fastest pace since May 2020 (index at 45.1).<\/p>\n<p>New order books across the construction sector as a whole deteriorated for the sixth successive month in June, with the rate of decline accelerating since May.<\/p>\n<p>Survey respondents commented on fewer tender opportunities and intense competition for new work, reflecting weak overall demand conditions and heightened risk aversion among clients.<\/p>\n<p>Tim Moore, Economics Director at S&amp;P Global Market Intelligence, said: &#8220;June data highlighted a sustained downturn in UK construction output, albeit at the slowest pace in six months.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"163817\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.constructionenquirer.com%2Fdirectory%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/enquirer_directory_mpu.gif\"\/><\/a><\/div>\n<\/div>\n<p>&#8220;Shrinking workloads in the commercial and civil engineering segments weighed on total industry activity. Commercial activity fell at the sharpest rate in just over five years.<\/p>\n<p>&#8220;On a brighter note, house building was the best-performing area of the construction sector. Higher levels of residential work were recorded for the first time since September 2024 amid some reports of more stable demand conditions.<\/p>\n<p>&#8220;The forward-looking survey indicators were weaker than in May. Total new orders fell at a faster pace as many construction companies signalled reduced overall workloads due to unfavourable domestic economic conditions and fragile confidence among clients.<\/p>\n<p>&#8220;At the same time, business activity expectations dipped to a two-and-a-half-year low in June. Survey respondents widely cited fewer tender opportunities, rising competition for new work and a projected headwind from subdued business investment during the year ahead.&#8221;<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"462809\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Ftinyurl.com%2F3m4thdsw%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/SS PressureTest+ 300_250px.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"479429\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fyoursolution%2F%3Futm_source%3Dconstructionenquirersite%26utm_medium%3Dwebskins%26utm_campaign%3Dys%252Blaunch%26utm_id%3Dyoursolution%252Blaunch%26utm_content%3DMPU%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/groundforceCE MPU 300 x 250.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/BxcNW7h<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction buyers have reported a return to growth in the house building sector for the first time since last September. But contraction in civil engineering and commercial work saw the bellwether S&amp;P Global UK Construction Purchasing Managers\u2019 Index drop below the standstill 50 mark again in June for the six month in a row. At [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-6398","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=6398"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6398\/revisions"}],"predecessor-version":[{"id":6399,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6398\/revisions\/6399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/145"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=6398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=6398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=6398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}