{"id":6562,"date":"2025-07-14T07:47:08","date_gmt":"2025-07-14T07:47:08","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=6562"},"modified":"2025-07-14T07:47:08","modified_gmt":"2025-07-14T07:47:08","slug":"mcalpine-breaks-ground-at-1-25bn-port-talbot-green-steel-job","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/mcalpine-breaks-ground-at-1-25bn-port-talbot-green-steel-job\/","title":{"rendered":"McAlpine breaks ground at \u00a31.25bn Port Talbot green steel job"},"content":{"rendered":"<p>Sir Robert McAlpine officially breaks ground today on the construction of an electric arc furnace at the Port Talbot steelworks in south Wales.<\/p>\n<p>The huge decarbonisation project will preserve 5,000 steelmaking jobs on site and cut emissions by 90% \u2013 equivalent to 1.5% of the UK\u2019s total direct CO2 output.<\/p>\n<p>Under the construction management contract Sir Robert McAlpine&#8217;s project team will total around 60 staff on site with over 400 contractors working for specialist firms on the overall project.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"498213\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ardenttide.co.uk%2Fcw%2FArticle-Seamless-Transition.html%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/atl-300-250.gif\"\/><\/a><\/div>\n<\/div>\n<p>Work includes demolition of existing buildings and structures, partial infill of the BOS lagoon, and construction of the electric arc furnace and two new ladle furnaces.<\/p>\n<p><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-07-14-at-07.39.49.png\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-499588\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-07-14-at-07.39.49.png\" alt=\"\" width=\"1286\" height=\"844\" \/><\/a><\/p>\n<p>The job also features upgraded slag processing, material handling systems, electrical control rooms, pipework and cabling, and new roads, landscaping and drainage.<\/p>\n<p>The EAF will use scrap steel instead of imported coal and iron ore \u2013 tapping into the 10m tonnes of scrap generated annually in the UK.<\/p>\n<div id=\"attachment_499589\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-07-14-at-07.38.46.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-499589 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-07-14-at-07.38.46.png\" alt=\"\" width=\"1630\" height=\"1086\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">Design of the EAF at the heart of the new plant<\/p>\n<\/div>\n<p>Around 70,000 tonnes of scrap will arrive at Port Talbot every week once the plant is operational.<\/p>\n<p>Steel will be tapped from the furnace at a rate of 320 tonnes every 42 minutes, creating annual capacity of around 3.2 million tonnes.<\/p>\n<p>Molten metal will be transferred into one of two new ladle furnaces where the<br \/>\nchemistry of the steel will be refined to obtain the desired grade.<\/p>\n<p>The electric arc furnace is due to switch on at the end of 2027 as part of the push towards greener production.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"498213\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ardenttide.co.uk%2Fcw%2FArticle-Seamless-Transition.html%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/atl-300-250.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"474739\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbrilliantideasltd.co.uk%2Falimats%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/6507-BI---Alimats-MPU---Constuction-Enquirer_01_s2.gif\"\/><\/a><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>from Construction Enquirer https:\/\/ift.tt\/CdnRaZ3<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sir Robert McAlpine officially breaks ground today on the construction of an electric arc furnace at the Port Talbot steelworks in south Wales. The huge decarbonisation project will preserve 5,000 steelmaking jobs on site and cut emissions by 90% \u2013 equivalent to 1.5% of the UK\u2019s total direct CO2 output. Under the construction management contract [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-6562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=6562"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6562\/revisions"}],"predecessor-version":[{"id":6563,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/6562\/revisions\/6563"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/154"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=6562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=6562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=6562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}