{"id":7098,"date":"2025-08-07T09:46:48","date_gmt":"2025-08-07T09:46:48","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=7098"},"modified":"2025-08-07T09:46:48","modified_gmt":"2025-08-07T09:46:48","slug":"spencer-jostles-in-for-29m-waterbeach-rail-station-job","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/spencer-jostles-in-for-29m-waterbeach-rail-station-job\/","title":{"rendered":"Spencer jostles in for \u00a329m Waterbeach rail station job"},"content":{"rendered":"<p>C Spencer has secured the \u00a329m contract to deliver the relocated Waterbeach railway station in Cambridgeshire, despite Volker Fitzpatrick carrying out early contractor involvement on the scheme.<\/p>\n<p>The win sees Spencer take over the reins after Volker&#8217;s early input shaping the scheme\u2019s scope and construction strategy. <\/p>\n<p>The contract includes full design and build for a brand-new two-platform station, which will replace the existing facility.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"494661\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbrand-accesssolutions.com%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/brand slower ezgif.com-animated-gif-maker.gif\"\/><\/a><\/div>\n<\/div>\n<p>The relocated station forms a key part of the Greater Cambridge Partnership\u2019s infrastructure to support thousands of new homes at Waterbeach New Town.<\/p>\n<p>Works will include a new access road from Cody Road, 200-space car park, accessible footbridge with lifts, bus and taxi drop-off areas, SME route, cycle parking and enhanced public realm. <\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"492636\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwinchmorebrickwork.co.uk%2Fabout-us%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/WINChMORE_JOBS_MPU.gif\"\/><\/a><\/div>\n<\/div>\n<p>Once complete, the station will transfer to Network Rail for long-term operation, with Great Northern continuing as the operator.<\/p>\n<p>WSP has led the ES4 preliminary design, while Sable Leigh Consultancy is acting as project manager and client rep.<\/p>\n<p>Only two bids were received for the job.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"468489\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.flanneryplanthire.com%2Fplant-operator-training%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/flannery.gif\"\/><\/a><\/div>\n<\/div>\n<p><\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"498213\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ardenttide.co.uk%2Fcw%2FArticle-Seamless-Transition.html%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/atl-300-250.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/7ijMm06<\/p>\n","protected":false},"excerpt":{"rendered":"<p>C Spencer has secured the \u00a329m contract to deliver the relocated Waterbeach railway station in Cambridgeshire, despite Volker Fitzpatrick carrying out early contractor involvement on the scheme. The win sees Spencer take over the reins after Volker&#8217;s early input shaping the scheme\u2019s scope and construction strategy. The contract includes full design and build for a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-7098","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=7098"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7098\/revisions"}],"predecessor-version":[{"id":7099,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7098\/revisions\/7099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/149"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=7098"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=7098"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=7098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}