{"id":7292,"date":"2025-08-19T07:47:20","date_gmt":"2025-08-19T07:47:20","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=7292"},"modified":"2025-08-19T07:47:20","modified_gmt":"2025-08-19T07:47:20","slug":"mclaren-lands-heathrow-logistics-deal","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/mclaren-lands-heathrow-logistics-deal\/","title":{"rendered":"McLaren lands Heathrow logistics deal"},"content":{"rendered":"<p>Heathrow Airport has appointed McLaren Construction for the redevelopment of its Eastern Business Park to build a new 9,481 sq m logistics scheme.<\/p>\n<p>Heathrow is redeveloping the 1.6 hectare site as four warehouse buildings, each split into eight units.<\/p>\n<p>The original buildings at the Eastern Business Park were built in around 1952 and were demolished earlier this year.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"128950\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.jctltd.co.uk%2Fjct-construct%2Fdigital-subscriptions\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/JCT-Construct_ConstEnq_MPU_300x250px-June2025.gif\"\/><\/a><\/div>\n<\/div>\n<p>The scheme is one of 14 \u2018spotlight projects\u2019 exploring new approaches to using lower carbon materials.<\/p>\n<p>The design allows most elements except footings and drainage to be manufactured offsite. The largest elements are the continuous roof panels which are 16 metres, including edge trims, gutters and solar array.<\/p>\n<p>The steel frame will be preassembled in a factory, stripped down for transport and erected on site. Flat roof sections will consist of cross-laminated timber panels brought to site completed and to size.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"492636\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwinchmorebrickwork.co.uk%2Fabout-us%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/WINChMORE_JOBS_MPU.gif\"\/><\/a><\/div>\n<\/div>\n<p>McLaren will work within the constraints of a busy live operational airport site during the 12\u201318-month construction period.<\/p>\n<p>McLaren Construction\u2019s managing director for industrial and logistics, David Gavin, said: \u201cHeathrow\u2019s status as a major hub creates opportunities not only in cargo handling but also for the many support services and businesses needed to meet the airport\u2019s essential operational needs.<\/p>\n<p>\u201cThese new Grade A warehouses represent a major transformation from the site&#8217;s post-war buildings. Their sustainable design highlights how far industrial development has moved on, and they now form an integral part of the airport\u2019s infrastructure.\u201d<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"500628\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ciob.org%2Fevents%2Fsustainable-construction-shifting-the-narrative-1307801522559%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Sustainable_Conf_ MPU 300x250_(Aug 2025).gif\"\/><\/a><\/div>\n<\/div>\n<p>Alistair Awcock, Infrastructure Director for Heathrow Airport added: \u201cThis infrastructure investment will provide prime logistics accommodation to our Heathrow partners, whilst modernising, strengthening and adding capacity to our perimeter property portfolio, supporting our customer strategy.\u201d<\/p>\n<div class=\"break-out-box\">\n<p><strong>McLaren\u2019s subcontractor team includes:<\/strong><\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Structural steelwork: SCWS<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Whitewall: Colclad<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Roofing and cladding: Roofdec<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0PV panels: Watt Energy<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Precast: FP McCann<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0Curtain walling: Ridgeway<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"468489\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.flanneryplanthire.com%2Fplant-operator-training%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/flannery.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"93789\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.constructionline.co.uk%2Fevents%2Fattending-marketplace-live%2F%3Futm_source%3Dreferral%26utm_medium%3Dconstruction_enquirer%26utm_campaign%3Dall_mpl_supplier%26utm_year%3D2025%26utm_content%3Dad_gif\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/constructionline ezgif.com-speed.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/SgZ6Plq<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Heathrow Airport has appointed McLaren Construction for the redevelopment of its Eastern Business Park to build a new 9,481 sq m logistics scheme. Heathrow is redeveloping the 1.6 hectare site as four warehouse buildings, each split into eight units. The original buildings at the Eastern Business Park were built in around 1952 and were demolished [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-7292","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7292","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=7292"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7292\/revisions"}],"predecessor-version":[{"id":7293,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7292\/revisions\/7293"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/152"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=7292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=7292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=7292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}