{"id":7334,"date":"2025-08-21T07:46:45","date_gmt":"2025-08-21T07:46:45","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=7334"},"modified":"2025-08-21T07:46:45","modified_gmt":"2025-08-21T07:46:45","slug":"plans-in-to-transform-former-gsk-london-hq-with-2300-homes","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/plans-in-to-transform-former-gsk-london-hq-with-2300-homes\/","title":{"rendered":"Plans in to transform former GSK London HQ with 2,300 homes"},"content":{"rendered":"<p>Developer Hadley Property Group has lodged a hybrid planning application to redevelop the flagship former GlaxoSmithKline headquarters in Brentford, West London.<\/p>\n<p>The ambitious scheme at 980 Great West Road spans 13 acres and proposes over 2,300 homes across a mix of tenures, with 35% classed as affordable.<\/p>\n<p>The plans also include around 330,000 sq ft of commercial and retail space, creating a new mixed-use neighbourhood along the M4 corridor.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"128950\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.jctltd.co.uk%2Fjct-construct%2Fdigital-subscriptions\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/JCT-Construct_ConstEnq_MPU_300x250px-June2025.gif\"\/><\/a><\/div>\n<\/div>\n<div id=\"attachment_500754\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Great-west-road.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-500754 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Great-west-road.jpg\" alt=\"\" width=\"1627\" height=\"1080\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">Former Glaxo HQ building at redevelopment site where 96% of building basement and substructure will be retained<\/p>\n<\/div>\n<p>Hadley, which bought the site two years ago, plans to retain and adapt two major buildings from the original campus \u2013 including the landmark tower \u2013 to cut embodied carbon and deliver new homes with oversized balconies, shared amenity areas and a rooftop conservatory.<\/p>\n<p><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Great-west-road-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-500756 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Great-west-road-3.jpg\" alt=\"\" width=\"1392\" height=\"1268\" \/><\/a><\/p>\n<p>Studio Egret West is leading the tower\u2019s redesign while also working on new affordable housing and extensive landscaping.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"431748\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fvacukltd.co.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/VACUK_V4.gif\"\/><\/a><\/div>\n<\/div>\n<p>More than 60% of the site is earmarked for public realm, with new play areas, gardens and access to the River Brent and Boston Manor Park.<\/p>\n<p>The proposals also include 23,000 sq m of employment space, with flexible units for local businesses, markets and events. Hadley says its plan will open up a previously closed site, creating \u201carrival, central, underside and riverside\u201d zones to reconnect the historic campus with Brentford High Street.<\/p>\n<div id=\"attachment_500755\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Great-west-road-4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-500755 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Great-west-road-4.jpg\" alt=\"\" width=\"1858\" height=\"1170\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">A strip of public space known as the Underside will run below the M4<\/p>\n<\/div>\n<p>Architects Haworth Tompkins, Metropolitan Workshop, Studio Egret West and dRMM are all involved in the design, with Turley advising on planning.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"124439\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.hudsoncontract.co.uk%2Fhudson-freelance%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/KCD043_MPU_Freelance_555x400px_Opt1_v1b.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"439734\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.intersteels.com%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Retro-FitsteelspecialistsGIF-ezgif.com-resize.gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"1651\" data-end=\"1817\">\n<p>from Construction Enquirer https:\/\/ift.tt\/YDUEZmC<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Developer Hadley Property Group has lodged a hybrid planning application to redevelop the flagship former GlaxoSmithKline headquarters in Brentford, West London. The ambitious scheme at 980 Great West Road spans 13 acres and proposes over 2,300 homes across a mix of tenures, with 35% classed as affordable. The plans also include around 330,000 sq ft [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-7334","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=7334"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7334\/revisions"}],"predecessor-version":[{"id":7335,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7334\/revisions\/7335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/149"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=7334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=7334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=7334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}