{"id":7404,"date":"2025-08-26T22:46:36","date_gmt":"2025-08-26T22:46:36","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=7404"},"modified":"2025-08-26T22:46:36","modified_gmt":"2025-08-26T22:46:36","slug":"green-light-for-10bn-data-hub-prep-works-in-northumberland","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/green-light-for-10bn-data-hub-prep-works-in-northumberland\/","title":{"rendered":"Green light for \u00a310bn data hub prep works in Northumberland"},"content":{"rendered":"<p data-start=\"192\" data-end=\"371\">Preparatory works have been signed off for a \u00a310bn hyperscale data centre at the site of the former Blyth Power Station in Northumberland.<\/p>\n<p data-start=\"192\" data-end=\"371\">The planning go-ahead for first stage enabling works marks the first on-the-ground step for one of the UK\u2019s biggest inward investment schemes.<\/p>\n<p data-start=\"373\" data-end=\"638\">QTS, owned by Blackstone, secured outline consent in May\u00a0for up to 10 data centre buildings totalling 540,000 sq m, plus substations, emergency generators and ancillary structures.<\/p>\n<p data-start=\"373\" data-end=\"638\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"163817\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.constructionenquirer.com%2Fdirectory%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/enquirer_directory_mpu.gif\"\/><\/a><\/div>\n<\/div>\n<div id=\"attachment_500867\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-08-27-at-00.49.58.png\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-500867 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-08-27-at-00.49.58.png\" alt=\"\" width=\"1600\" height=\"918\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">Planned Cambois data centre complex<\/p>\n<\/div>\n<p data-start=\"640\" data-end=\"962\">Consultant Arcadis advised on the first reserved matters approval, which covers Phase A enabling works and will roll out in stages over 16 months to autumn 2026 across a 54-hectare site.<\/p>\n<p data-start=\"640\" data-end=\"962\">This includes setting up compounds, vegetation clearance, perimeter fencing and extensive earthworks to prepare for the full campus build.<\/p>\n<p data-start=\"640\" data-end=\"962\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"474739\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbrilliantideasltd.co.uk%2Falimats%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/6507-BI---Alimats-MPU---Constuction-Enquirer_01_s2.gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"964\" data-end=\"1205\">The 540,000 sq m data hub will use QTS\u2019s closed-loop water system and is expected to generate 1,200 long-term construction jobs over the course of the phased construction programme.<\/p>\n<div id=\"attachment_500869\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-08-27-at-00.35.25.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-500869 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-08-27-at-00.35.25.png\" alt=\"\" width=\"2012\" height=\"1664\" \/><\/a><\/p>\n<p class=\"wp-caption-text\">The site lies just north of the village of Cambois and will be extensively redeveloped<\/p>\n<\/div>\n<p data-start=\"1427\" data-end=\"1685\">The professional team includes London architect Corgan with Cundall providing civils, structural and MEP consultancy.<\/p>\n<p data-start=\"1427\" data-end=\"1685\">Northumberland council leader Glen Sanderson said: \u201cThis marks another significant milestone for QTS\/Blackstone and all of Northumberland, and is another big step forward towards realising the massive benefits and opportunities this scheme will bring.\u201d<\/p>\n<p data-start=\"1427\" data-end=\"1685\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"500628\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.ciob.org%2Fevents%2Fsustainable-construction-shifting-the-narrative-1307801522559%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Sustainable_Conf_ MPU 300x250_(Aug 2025).gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"1687\" data-end=\"1832\">The county will also benefit from a \u00a3110m fund linked to the project, earmarked for jobs and growth along the Northumberland Line corridor.<\/p>\n<p data-start=\"1834\" data-end=\"2137\">QTS co-CEO Tag Greason added: \u201cThe enabling works approval is a major milestone and the first visible step in delivering on our shared vision with the council.<\/p>\n<p data-start=\"1834\" data-end=\"2137\">&#8220;We remain committed to hiring locally, supporting training and economic growth, and being responsible, engaged members of the community.\u201d<\/p>\n<p data-start=\"1834\" data-end=\"2137\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"124439\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.hudsoncontract.co.uk%2Fhudson-freelance%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/KCD043_MPU_Freelance_555x400px_Opt1_v1b.gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"1834\" data-end=\"2137\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"158465\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.agd-equipment.co.uk%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/AGD-ADVERT-2023.gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"1834\" data-end=\"2137\">\n<p>from Construction Enquirer https:\/\/ift.tt\/gfT6zaR<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Preparatory works have been signed off for a \u00a310bn hyperscale data centre at the site of the former Blyth Power Station in Northumberland. The planning go-ahead for first stage enabling works marks the first on-the-ground step for one of the UK\u2019s biggest inward investment schemes. QTS, owned by Blackstone, secured outline consent in May\u00a0for up [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-7404","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7404","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=7404"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7404\/revisions"}],"predecessor-version":[{"id":7405,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/7404\/revisions\/7405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/149"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=7404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=7404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=7404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}