{"id":8078,"date":"2025-09-26T07:46:56","date_gmt":"2025-09-26T07:46:56","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=8078"},"modified":"2025-09-26T07:46:56","modified_gmt":"2025-09-26T07:46:56","slug":"william-hare-wins-first-steelwork-order-for-sizewell-c","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/william-hare-wins-first-steelwork-order-for-sizewell-c\/","title":{"rendered":"William Hare wins first steelwork order for Sizewell C"},"content":{"rendered":"<p>Lancashire steelwork specialist William Hare Group has secured a major contract to deliver the structural steel package for the amenity building at Sizewell C\u2019s on-site accommodation campus.<\/p>\n<p>The deal will see over 500 tonnes of steel fabricated at the company\u2019s Scarborough plant in North Yorkshire before erection of a two-storey frame on the Suffolk coast.<\/p>\n<p>The amenity building will form the hub of Sizewell C\u2019s worker accommodation campus, supporting thousands of out-of-area staff during the decade-long build.<\/p>\n<p data-start=\"568\" data-end=\"725\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"500979\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.cadmancranes.com%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Cadman Cranes - Construction Enquirer - MPU Digital Advert.gif\"\/><\/a><\/div>\n<\/div>\n<p>William Hare brings more than 50 years of nuclear sector experience to the job, having worked extensively on Hinkley Point C since 2019.<\/p>\n<p>Fabrication work will start in October, with on-site installation expected before the end of 2025.<\/p>\n<p data-start=\"867\" data-end=\"967\"><a href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/www.eadt_.co_.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-497839\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/www.eadt_.co_.jpg\" alt=\"\" width=\"620\" height=\"348\" \/><\/a><\/p>\n<p data-start=\"969\" data-end=\"1292\">Sizewell C joint managing director Nigel Cann said awarding the contract to a UK steel business was part of a pledge to ensure 70% of construction spend stays with domestic firms. \u201cThis is also great news for the North of England, where we\u2019ve already committed to investing \u00a32.5bn during the construction of our project.\u201d<\/p>\n<p data-start=\"969\" data-end=\"1292\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"500482\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fsolatube.co.uk%2Fcommercial%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Sola Systems Display Button (300 x 250 px).gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"1294\" data-end=\"1430\">The Scarborough facility \u2013 home to the UK\u2019s first fabrication robot \u2013 will deliver the bulk of the framework on a fast-track schedule.<\/p>\n<p>The latest contract award follows a construction management agreement with McLaren Construction will deliver the 2,400-bed campus for site workers, hailed as setting new standards in site accommodation.<\/p>\n<p>The scheme will see 16 residential blocks of three and four storeys built to house the incoming workforce.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"158465\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.agd-equipment.co.uk%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/AGD-ADVERT-2023.gif\"\/><\/a><\/div>\n<\/div>\n<p>Each building will contain single-occupancy living units, each with its own ensuite, kitchenette, wardrobe, desk and TV.<\/p>\n<p>Every floor will house around 40 rooms accessed via a central corridor, with shared services cupboards providing hot water, power and waste distribution. Eight accessible rooms will be included in each three-storey block.<\/p>\n<p data-start=\"1432\" data-end=\"1570\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"501317\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fjagosteel.com%2Ftreadform-balustrades%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/jago Comp 1 3 (1).gif\"\/><\/a><\/div>\n<\/div>\n<p data-start=\"1432\" data-end=\"1570\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"454840\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fforms.reg.buzz%2Fukcw-birmingham-2025%2Fconstruction-enquirer%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/UKCW25 300x250 2.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/U3H8OCj<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lancashire steelwork specialist William Hare Group has secured a major contract to deliver the structural steel package for the amenity building at Sizewell C\u2019s on-site accommodation campus. The deal will see over 500 tonnes of steel fabricated at the company\u2019s Scarborough plant in North Yorkshire before erection of a two-storey frame on the Suffolk coast. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":149,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-8078","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=8078"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8078\/revisions"}],"predecessor-version":[{"id":8079,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8078\/revisions\/8079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/155"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=8078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=8078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=8078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}