{"id":8398,"date":"2025-10-13T06:46:31","date_gmt":"2025-10-13T06:46:31","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=8398"},"modified":"2025-10-13T06:46:31","modified_gmt":"2025-10-13T06:46:31","slug":"firms-put-on-standby-for-5bn-flood-defence-shake-up","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/firms-put-on-standby-for-5bn-flood-defence-shake-up\/","title":{"rendered":"Firms put on standby for \u00a35bn flood defence shake-up"},"content":{"rendered":"<p>The Environment Agency has ramped up plans for its next-generation flood and coastal defence framework, with the budget rising from \u00a33bn to \u00a35bn.<\/p>\n<p>Contractors are now being put on standby for a final round of market engagement on the new Collaborative Delivery Framework 2 (CDF2) after a one year delay in procurement.<\/p>\n<p>The new setup replaces the existing \u00a33bn framework that brought together BAM Nuttall, Kier, Jackson Civil Engineering and VolkerStevin, alongside designers Arup, Atkins, Jacobs and Jeremy Benn Associates.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"92582\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbit.ly%2F3KAlSlI%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Lynch MPU Ad.jpg\"\/><\/a><\/div>\n<\/div>\n<p>CDF2 will run for eight years from 2027 to 2035. <\/p>\n<p>It will cover the full range of flood and coastal management works, including asset maintenance, refurbishment, design and construction. The Agency wants bidders capable of blending environmental innovation with civil engineering delivery, combining nature-based schemes with traditional flood defences.<\/p>\n<p>Formal tenders are now expected to be issued in March 2026, with draft documents and bidder packs available for review via the secure Quatrix portal.<\/p>\n<p>Projects will range in size from \u00a31m to \u00a3150m, divided into design and construction lots. Smaller works between \u00a31m and \u00a35m will be procured separately from larger projects above \u00a35m.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"492636\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwinchmorebrickwork.co.uk%2Fabout-us%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/WINChMORE_JOBS_MPU.gif\"\/><\/a><\/div>\n<\/div>\n<p>In-person market engagement sessions will be held on Tuesday 21 October at Mary Ward House, Tavistock Place, London, followed by an online event on Tuesday 4 November.<\/p>\n<p>Access requests for documentation and event registration should be sent to <a href=\"mailto:cdfreplacement@defra.gov.uk\" target=\"_blank\" rel=\"noopener\">cdfreplacement@defra.gov.uk<\/a>.<\/p>\n<p>The new \u00a35bn programme is being procured by the Environment Agency with Defra\u2019s commercial team and is set to become one of the largest flood resilience delivery frameworks in the country.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"462809\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fpipe-stoppers%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/stoppers SS PTS MPU Ad 300_250px.gif\"\/><\/a><\/div>\n<\/div>\n<p><\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"158465\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.agd-equipment.co.uk%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/AGD-ADVERT-2023.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/i7rmRK9<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Environment Agency has ramped up plans for its next-generation flood and coastal defence framework, with the budget rising from \u00a33bn to \u00a35bn. Contractors are now being put on standby for a final round of market engagement on the new Collaborative Delivery Framework 2 (CDF2) after a one year delay in procurement. The new setup [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":152,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-8398","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=8398"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8398\/revisions"}],"predecessor-version":[{"id":8399,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8398\/revisions\/8399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/154"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=8398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=8398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=8398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}