{"id":8636,"date":"2025-10-23T07:47:04","date_gmt":"2025-10-23T07:47:04","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=8636"},"modified":"2025-10-23T07:47:04","modified_gmt":"2025-10-23T07:47:04","slug":"bovis-kier-and-wates-land-1-5bn-parliament-revamp","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/bovis-kier-and-wates-land-1-5bn-parliament-revamp\/","title":{"rendered":"Bovis, Kier and Wates land \u00a31.5bn Parliament revamp"},"content":{"rendered":"<p>Ten firms have secured places on a new \u00a31.5bn framework to deliver the programme of on-going repairs and improvements to the Houses of Parliament and its wider MP estate in London.<\/p>\n<p>Bovis, Kier and Wates share the top slot for major mixed-discipline projects over \u00a350m under the Parliamentary Construction Partnership framework to keep the Palace of Westminster safe and operational into the early 2030s.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"494661\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbrand-accesssolutions.com%2Fg-deck%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/brand image001.gif\"\/><\/a><\/div>\n<\/div>\n<p>The new set-up, which replaces the existing MEPFS (Mechanical, Electrical, Public health, and Fabric Safety) framework, has been broken into four lots covering M&amp;E, building and fit-out works.<\/p>\n<table style=\"border-collapse: collapse; border-spacing: 0px; border: 2pt solid #ff511c; font-family: Arial, sans-serif; font-size: 14px; width: 680px; line-height: 1.6; height: 362px;\">\n<tbody>\n<tr style=\"background-color: #ff511c; color: #fff; font-size: 18px;\">\n<td style=\"padding: 12px;\" colspan=\"4\"><strong>Parliamentary framework \u2013 award breakdown<\/strong><\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 12px; width: 15%;\"><strong>Lot<\/strong><\/td>\n<td style=\"padding: 12px; width: 22%;\"><strong>Typical project value<\/strong><\/td>\n<td style=\"padding: 12px; width: 18%;\"><strong>Total lot value<\/strong><\/td>\n<td style=\"padding: 12px; width: 45%;\"><strong>Suppliers<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 12px;\">Lot 1<\/td>\n<td style=\"padding: 12px;\">Over \u00a350m, mixed-discipline projects<\/td>\n<td style=\"padding: 12px;\">\u00a3500m<\/td>\n<td style=\"padding: 12px;\">Bovis; Kier; Wates<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 12px;\">Lot 2<\/td>\n<td style=\"padding: 12px;\">\u00a35m\u2013\u00a350m, M&amp;E (public health &amp; fire)<\/td>\n<td style=\"padding: 12px;\">\u00a3400m<\/td>\n<td style=\"padding: 12px;\">Dalkia Facilities; Mitie; Emico; East West Connect<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 12px;\">Lot 3<\/td>\n<td style=\"padding: 12px;\">Up to \u00a350m, architectural\/structural\/conservation<\/td>\n<td style=\"padding: 12px;\">\u00a3400m<\/td>\n<td style=\"padding: 12px;\">Kier; Wates; Walter Lilly; Thomas Sinden<\/td>\n<\/tr>\n<tr style=\"background-color: #f9f9f9;\">\n<td style=\"padding: 12px;\">Lot 4<\/td>\n<td style=\"padding: 12px;\">Up to \u00a35m, building, fit-out and M&amp;E<\/td>\n<td style=\"padding: 12px;\">\u00a3200m<\/td>\n<td style=\"padding: 12px;\">DBR (London); Mitie; Emico; Thomas Sinden; Walter Lilly<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Works under the new seven-year framework will cover essential upkeep investment, rather than the full Restoration and Renewal plan for Parliament, which has still to be planned and agreed.<\/p>\n<p>Contracts will be let under NEC4 by direct award or mini-competition with performance tracked through KPIs.<\/p>\n<p>Quality carried an 80% weighting at tender covering delivery, H&amp;S, risk, sustainability and a lot-specific technical response, with price at 20%.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"494661\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fbrand-accesssolutions.com%2Fg-deck%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/brand image001.gif\"\/><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"163817\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.constructionenquirer.com%2Fdirectory%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/enquirer_directory_mpu.gif\"\/><\/a><\/div>\n<\/div>\n<p>from Construction Enquirer https:\/\/ift.tt\/NGk0VY2<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ten firms have secured places on a new \u00a31.5bn framework to deliver the programme of on-going repairs and improvements to the Houses of Parliament and its wider MP estate in London. Bovis, Kier and Wates share the top slot for major mixed-discipline projects over \u00a350m under the Parliamentary Construction Partnership framework to keep the Palace [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":149,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-8636","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=8636"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8636\/revisions"}],"predecessor-version":[{"id":8637,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/8636\/revisions\/8637"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/153"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=8636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=8636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=8636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}