{"id":903,"date":"2018-11-28T01:40:07","date_gmt":"2018-11-28T01:40:07","guid":{"rendered":"https:\/\/cita.co.uk\/news\/?p=903"},"modified":"2018-11-28T01:40:07","modified_gmt":"2018-11-28T01:40:07","slug":"interserve-clinches-17m-carmarthen-hospital-job","status":"publish","type":"post","link":"https:\/\/cita.co.uk\/news\/interserve-clinches-17m-carmarthen-hospital-job\/","title":{"rendered":"Interserve clinches \u00a317m Carmarthen hospital job"},"content":{"rendered":"<p>Interserve has started a \u00a317m contract to deliver the construction phase of the improvements of obstetric and neonatal facilities at Glangwili Hospital in Carmarthen.<\/p>\n<p>Awarded through the Designed for Life 2 Framework, the\u00a0project involves refurbishing existing buildings, together with a new two-storey extension.\u00a0 Work will be carried out in multiple phases.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"102889\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.course-info.co.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CSP-CE-295x245-Frames.gif\"\/><\/a><\/div>\n<\/div>\n<p>This second phase of redevelopment will increase the capacity of the facilities at the hospital and will include high-dependency and special-care cots and parent overnight stay rooms, as well as increasing the number of birthing rooms, operating theatres and resuscitation bays. Plans are also in place for an additional 45 car parking spaces.<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"94467\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.sapabuildingsystem.com%2Fen%2Fuk%2F%3Futm_source%3DCE%26utm_medium%3DBanner%26utm_campaign%3DBrand_Awareness%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE-Sapa-v1-1017.gif\"\/><\/a><\/div>\n<\/div>\n<p>Carl Read, divisional director at Interserve, said: \u201cThis is excellent news and continues our success on the Designed for Life Frameworks and also building on the good relationship we have with Hywel Dda University Health Board.\u201d<\/p>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"95430\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.nasc.org.uk%2Fnews%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CE_NASC_FREE-GUIDANCE.gif\"\/><\/a><\/div>\n<\/div>\n<p class=\"p1\">\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a data-ad-id=\"145884\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fndtg.training%2Fccdo-card%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"http:\/\/www.constructionenquirer.com\/wp-content\/uploads\/CCDO-Banner-Loop.gif\"\/><\/a><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>from Construction Enquirer https:\/\/ift.tt\/2FM3N26<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Interserve has started a \u00a317m contract to deliver the construction phase of the improvements of obstetric and neonatal facilities at Glangwili Hospital in Carmarthen. Awarded through the Designed for Life 2 Framework, the\u00a0project involves refurbishing existing buildings, together with a new two-storey extension.\u00a0 Work will be carried out in multiple phases. This second phase of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[9],"class_list":["post-903","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-construction-enquirer"],"_links":{"self":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/comments?post=903"}],"version-history":[{"count":1,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/903\/revisions"}],"predecessor-version":[{"id":904,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/posts\/903\/revisions\/904"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media\/156"}],"wp:attachment":[{"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/media?parent=903"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/categories?post=903"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cita.co.uk\/news\/wp-json\/wp\/v2\/tags?post=903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}